摘要:簡介:智能井完井技術中,動態控制很重要。其四大作用包括提高最終采收率、增進優化產能,減少井下作業量和環境影響最小化。 INTELLIGENT WELL COMPLETIONS Active control is a key fact...
簡介:智能井完井技術中,動態控制很重要。其四大作用包括提高最終采收率、增進/優化產能,減少井下作業量和環境影響最小化。

INTELLIGENT WELL COMPLETIONS
Active control is a key factor in intelligent well completions
Maximize final recovery of reserves through an exploitation strategy based on maximum control, real-time monitoring and closed-loop capability.  
Jesus Contreras and Fernando Kirnbauer, Baker Hughes Incorporated 
Intelligent Well System (IWS) completions provide absolute control over reservoir exploitation. The four most important reasons to install an IWS completion are to maximize final recovery of reserves, accelerate/optimize production, reduce intervention operations and minimize environmental impact.
The key factor in maximizing final recovery with an IWS completion is to provide the capability of modifying the production or injection conditions of the well according to the depletion process of the reservoirs or as the result of changing operational conditions. This is active control. The purpose of this control concept is to provide maximum capability to adapt to the variable conditions of the reservoir. There are two control levels: on-off and adjustable (choking capability).
MAXIMIZING FINAL RECOVERY
A coherent reservoir exploitation strategy is required to maximize final recovery of reserves in an economical way. Most of the time, the reservoir operational conditions are very complex, in some cases due to reservoir characteristics (deposition environment, many intercalations, high pressure/high temperature, faults, low or high productivity, gas cap, aquifers, etc.) and in other cases because of specific decisions made during the exploitation cycle. Through the control of the production or injection parameters of the wells, IWS completions help to correct or reduce the uncertainty associated with reservoir exploitation, increasing the possibility of maximizing final recovery of reserves.
ACCELERATE AND OPTIMIZE PRODUCTION
This reservoir exploitation strategy should address reducing exploitation time due to economic, regulatory or strategic reasons. The ideal application for IWS completions is for producing at the same time from different formations with different reservoir characteristics (petrophysical or fluids) or different energy levels (pressure). The variable to be controlled for optimizing flow of fluids is the bottomhole flowing pressure per zone (PWF).
IWS completions can be used for controlling different formations or reservoirs at the same time, maximizing production per zone, and reducing risks associated with cross flow or differential depletion. As a result of this control strategy, production is optimized (optimal production profiles) and the recovery is accelerated. Gauges installed per zone monitor the PWF and let engineering personnel (in charge of making key decisions) interpret specific tendencies for making the right decisions.
REDUCE INTERVENTION COSTS
IWS completions are designed to last for the life of the well. The design for each well is made to afford most of the possible operational situations that could happen in any period of the field life (e.g., water or gas channeling, differential depletion, production or injection profile issues). Obviously, the gauges installed provide real-time data per zone that is used for reducing uncertainties, optimizing production or injection, and making proactive rather than reactive decisions.
Reducing intervention in deepwater wells is important because of the high costs involved. In that sense, many operators would choose higher initial investment if it reduces future operational costs and risks associated with intervention due to problems they did not initially expect. However, if an intervention becomes imperative after the intelligent well system completion is installed (e.g., for correcting a problem associated with productivity), the IWS completion offers the flexibility of diversion.
MINIMIZE ENVIRONMENTAL IMPACT
Buildup tests, workovers and running production logs are well interventions. In all these cases, the risk of generating an environmental impact is always there in traditional well completions.
If the IWS completion installed has gauges for monitoring well behavior and for interpreting reservoir exploitation strategy, chemical injection systems for reducing risk associated with plugs, and trained personnel monitoring the data received through signals these systems generate, then the risks of proceeding with well intervention would be very low because of the decisions associated with reservoir exploitation strategies will be proactive (prevention) instead of reactive (corrections).
Figure 1 shows the typical process service company technical personnel follow for selecting the appropriate design during an IWS analysis. The first part of the process (colored) is associated with reservoir and production analysis. The second part of the process (not colored) shown in Fig. 1 is the IWS completion, economics proposal, manufacturing process, quality control, HS&E procedures and field execution.
    
Fig. 1. Flow diagram for selecting, installing and managing an IWS completion. 
Reservoir and production analyses are performed to determine the IWS completion configuration, control philosophy, control levels, gauge specifications, chemical injection needs, new production behavior and possible new recovery factor; taking into account the information provided by the customer.
Nodal analysis is an important tool for determining initial production condition (total or per zone). Additionally, this analysis helps in configuring the control valve adjustable internal positions (mechanical configuration) and for determining the additional production that would be obtained with this application. However, this information is only one snapshot (the solution in a specific moment during the life of the well).
Currently, service company technical personnel perform near-wellbore analysis using reservoir simulators, with the objective of estimating the future behavior of the well considering the current or new exploitation strategy. In addition to initial production, it is now possible to predict possible scenarios associated with reservoir exploitation, with the objective of designing the IWS completion for most of the operational conditions that would be occur during the exploitation life of the reservoirs.
IWS APPLICATIONS
In general, IWS completions are well suited for these applications: commingled production, correction of production or injection profiles issues, deepwater wells and dump-flood strategies.
COMMINGLED PRODUCTION
Some fields have two or more reservoirs that could be produced at the same time (usually at different depths). However, these reservoirs could have different petrophysical properties, fluid characteristics and/or different pressures. Using an IWS completion lets the operator simultaneously produce from these reservoirs, reducing risks related to cross flow and differential depletion. An IWS completion accelerates production by taking advantage of real-time monitoring and active control. Figure 2 shows a possible reservoir example for this application.
   
Fig. 2. Commingled production from three reservoirs. 
INJECTION PROFILE ISSUES
For a number of reasons, many oil and gas reserves have been bypassed during the reservoir exploitation process. One reason is that reservoirs can be subdivided (in many cases) by some fluids units inside the same reservoir with different petrophysical properties. In many cases, no vertical communication between these flow units exists. Additionally, these flow units can have different volumes. Figure 3 shows an example of injection and production profile issues. As a result of this normal characteristic of reservoirs, differential depletion occurs (some flow units deplete faster than others) during the production process or differential replacement occurs (some fluids units build up their pressure faster than others), when injecting fluids for pressure support.
   
Fig. 3. Reservoir with different flow units and injection profile problems. 
Traditional solutions can be tried to correct or to avoid these issues (e.g., mechanical or chemical blocking, selective completions, density control during perforating), but most of the time these techniques will not provide a permanent solution because reservoir conditions are changing permanently as consequence of exploitation. In this sense, IWS completions (active control) are the best solution for this typical problem. The idea is to produce or inject (through active control valves) the fluids that each flow unit has the capacity for or requires, according to its petrophysical properties or energy levels. Figure 4 shows movement of fluids from injector wells to a producer well in a scenario of no uniform injection (injection profile issues).
For this example, it can be observed that the fluid injected through flow unit number four (injector well) will arrive faster to the producer well compared with other fluids units. Once this happens, it will be very difficult to recover the reserves associated with the other fluid units (1, 2, 3 and 5).
Figure 4 shows the same behavior as in Fig. 3. However, in this case a reservoir simulator was used to understand better the behavior at the reservoir level. For this analysis, one producer and four injector wells were used (with the same number of fluid units previously discussed).
It can be observed that through Zone 4 (Fig. 3) the water will arrive first from the injector well to the producer well. This means that a good part of the reserves would be bypassed if control actions in injector wells are not taken (this is the kind of problem operators try to avoid daily). Figure 4 confirms the information interpreted in Fig. 3.
    
Fig. 4. Simulation of channeling process of one specific flow unit. IWS completions can avoid or correct problems like this. 
OFFSHORE AND DEEPWATER WELLS
One of the most complex and challenging applications for IWS completions is offshore, especially deepwater. The obvious aspects of the complexity are high-pressure high-temperature, extreme deep conditions, high levels of uncertainties associated with geological and reservoir aspects, etc. Additional challenges are: high drilling costs, high workover costs, high costs of surface and marine facilities and environmental regulations.
Uncertainty levels associated with exploitation are higher compared to traditional land reservoirs, especially because interventions are not economical. Well completions are designed to accommodate most of the possible contingencies. For this reason, IWS completions are frequently installed in this kind of well. This includes the most sophisticated real-time monitoring systems and control valves with maximum flexibility (choking capability) for making the right decisions at the right time.
One of the most important objectives of offshore/deepwater exploitation strategies is to minimize the number of wells to be drilled, while maximizing final recovery of reserves. For this, well architecture (vertical, highly deviated, horizontal, multilateral, etc.) is fundamental, and for all these cases IWS completions are an ideal solution.
DUMP FLOOD STRATEGIES
Enhanced Oil Recovery (EOR) strategies are among the most complex and successful methods for maximizing final recovery of reserves. Surface facilities, operations and logistics associated with EOR operations are very expensive, especially if they are used in offshore or in deepwater projects. Reducing costs in these projects is highly desirable.
In some fields, an aquifer or gas cap with enough energy and reserves (water or gas) could be used for providing fluids with enough energy for injecting directly into some reservoirs or formations. This strategy takes advantage of a natural deposition and migration process that occurred in the past and is now available in the field during exploitation. The idea is to install an IWS completion, proceed to produce a specific fluid with energy (water or gas), and injecting that fluid in a specific volume on each reservoir that requires it for maintaining the replacement factor in the values specified by the exploitation strategy, before that fluid arrives at surface. Obviously, adjustable control valves are the key factor for optimizing the replacement factor and, as consequence, the recovery factor of the field.
Figure 4 shows an example of a dump flood. The different petrophysical properties and energy values of the reservoirs (different green colors) and of the aquifer (blue color) can be seen. Additionally, Fig. 5 shows the possible mechanical configuration of the IWS completion for this well. In this case, the control valves (yellow color) are adjustable for controlling the water volume to be injected into each reservoir.
   
Fig. 5. Dump flood example. Aquifer is used for injection into other formations. 
CONTROL PHILOSOPHY
A normal selective completion using sliding sleeves (mechanically activated), with packers between different zones, was once the most sophisticated system for trying to control commingled production. Obviously, these systems required wireline or coiled tubing for activation. The advantages and disadvantages of these mechanical systems are:
Advantages       
?                                 Low cost of sliding sleeve             
?                                 Low cost of packers     
?                                 Can exploit more than one zone simultaneously       
Disadvantages
?                                 Choking does not control flow from different zones
?                                 Cross flow cannot be controlled
?                                 Problems in a zone often require shutting off the zone
?                                 Production or injection problems cannot be corrected
?                                 Wireline operations increase the risk of fishing
?                                 Reservoir cannot be monitored in real time
?                                 Possibility of deferred production
?                                 Possibility of environmental impacts
Electrical and hydraulic are the two methods of bottomhole control. Hydraulically actuated systems are the most popular control systems in current use.
HYDRAULIC ACTIVATED SYSTEM, TWO POSITIONS (ON-OFF)
This system requires control lines installed with the completion for activation and feed-thru packers for isolation. The most important advantages and disadvantages are:
Advantages       
?                                 Multiple formations can be produced simultaneously
?                                 Multiple formations can be monitored in real time
?                                 Control valves can be activated remotely    
?                                 Well test can be performed without intervention     
?                                 Does not require maintenance   
Disadvantages
?                                 Completion cost is higher than mechanical systems
?                                 Flow from different zones cannot be choked
?                                 Cross flow cannot be controlled
?                                 Problems in a zone often require shutting off the zone
?                                 Production or injection profile problems cannot be corrected
It can be observed that these systems have more advantages than mechanically activated systems, but they have some disadvantages that are crucial from a reservoir strategy point of view. However, some applications would require these specific control philosophy equipments.
HYDRAULIC ACTIVATED SYSTEM, MULTIPLE POSITIONS (CHOKING CAPABILITY)
These systems require control lines installed with the completion for activation and feed-thru packers for isolation. The most important advantages and disadvantages are:
Advantages       
?                                 Total control of production or injection profiles      
?                                 No cross flow between different zones
?                                 Real-time monitoring of different zones (producing or injecting
?                                 Control valves can be activated remotely
?                                 Well test can be performed without intervention
?                                 Operations associated with production or injection optimization can be performed online (closed loop)
?                                 Does not require maintenance
Disadvantages
?                                 Completion cost is higher than mechanical systems
It is obvious that IWS completions with choke capability have more advantages and fewer disadvantages. They offer the maximum control of most of the possible operational conditions that could happen during the lifecycle of the well.
IWS completions offer flexibility and reliability, but the most important aspect of this technology is its ability to adapt to changing well conditions, whether these changes are part of a planned reservoir exploitation strategy or an unplanned event.
Finally, it is important to note that each IWS completion application is different, and control requirements could vary from one application to other. But in general, IWS completions with choke capability will increase the possibility of higher reserves recovery compared to traditional completions (no control), mechanically activated systems, on-off systems, or any other control technology including passive control completion systems such as inflow control devices.
Detailed analysis, evaluation, and simulation must be performed to determine the correct approach to an IWS completion to get the greatest value from this technology. An IWS completion is the key component of an exploitation strategy to maximize final recovery of reserves through maximum control, real time monitoring and closed loop capability. IWS completions can help operators make the right decision at the right time by reducing uncertainty levels.  

楊寶劍 是振威(全球)石油網的高級技術編輯,在石油技術資訊行業有八年的學識和經驗。他源源不斷地提供石油行業全球最新的技術創新、研發成果、現場應用情況等信息。如果你對該項新技術有任何的疑問,或者對“新技術新產品”未來的內容有任何問題或建議,請聯系楊寶劍編輯 +86 10-58236512 Email:allenyo@zhenweiexpo.com 歡迎與行業互動!


          您的分享是我們前進最大的動力,謝謝!
關鍵字: 智能井 完井 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2012 m.179ck.com Inc All Rights Reserved 全球石油化工網 版權所有
京ICP證120803號 京ICP備05086866號-8 京公網安備110105018350
国产精品亚洲一区二区麻豆_久久精品国产亚洲AV网站_亚洲成人网在线观看_久久精品国产亚洲夜色AV网站

<label id="un5f4"><meter id="un5f4"></meter></label>
  • <rt id="un5f4"><small id="un5f4"></small></rt>
    1. 97avcom| 国产精品精品软件视频| 日韩电影在线观看一区| 在线观看欧美亚洲| 精品久久久免费| 国产稀缺精品盗摄盗拍| 77777亚洲午夜久久多人| 青青青爽久久午夜综合久久午夜| 国产精品12345| 欧美精品丝袜久久久中文字幕| 精品精品视频| 成人激情黄色网| 972aa.com艺术欧美| 动漫av在线免费观看| 日韩在线中文字| 久久精品人人| 蜜桃免费在线视频| 国产亚洲xxx| 亚洲一区国产一区| 精品一卡二卡三卡| 日韩av在线网站| 欧美国产精品| 欧美在线观看视频免费| 337p亚洲精品色噜噜| 欧美亚洲国产激情| 91精品国产吴梦梦| 日韩欧美一二区| 欧美久久影院| 欧美三级一级片| 亚洲国产天堂久久综合| 欧美激情1区2区| 欧美 日本 亚洲| 国产午夜精品理论片a级探花| 激情久久五月| 久久精品视频91| 原创国产精品91| 麻豆传媒一区二区三区| 黑鬼大战白妞高潮喷白浆| 亚洲另类激情图| 免费成人你懂的| 色诱av手机版| 欧日韩不卡在线视频| 国产视频一区二区在线观看| 四虎视频在线精品免费网址| 国产女人水真多18毛片18精品| 亚洲线精品一区二区三区| 精品国产一区二区三区成人影院 | 成人h精品动漫一区二区三区| 97人人模人人爽人人澡| 欧美国产日韩在线| 国产人伦精品一区二区| 99tv成人影院| 日韩一区二区三区高清| 欧美放荡的少妇| 国产在线成人| 在线观看免费av网址| 欧美精品在线播放| 久久精品视频在线看| 国产高清亚洲| 亚洲在线不卡| 日韩禁在线播放| 久久www免费人成看片高清| 亚洲av片不卡无码久久| 91精品天堂| 欧美在线不卡一区| 影音先锋久久资源网| 国产精品二区视频| 国产精品美乳在线观看| 欧美日韩加勒比精品一区| 91精品一区二区三区综合| 亚洲欧美激情网| 日本成人激情视频| 无吗不卡中文字幕| 欧美精品一卡| 免费黄色三级网站| 91中文字精品一区二区| 在线观看国产91| 久久久久国产精品一区二区| 亚洲av无码一区二区二三区| 国产一区二区黄色| 精品国产精品一区二区夜夜嗨| 欧美aaaaaa午夜精品| 谁有免费的黄色网址| 精品国产一区二区三区麻豆小说| 日韩欧美一级二级| 国产乱码精品一区二区三区av| av在线精品| a天堂资源在线观看| 色综合视频网站| 亚洲精品一二三四区| 久久在线视频| 亚洲欧美日韩偷拍| 久久国产一区| 亚洲开心激情网| 337p粉嫩大胆噜噜噜噜噜91av| 日韩深夜影院| 午夜免费福利视频在线观看| 国产在线视频一区| 欧美一区二区视频在线观看| 成人性视频网站| 精品网站aaa| 亚洲欧美国产中文| 亚洲最大的免费| 亚洲精品国产精品自产a区红杏吧| 岛国精品在线播放| 亚洲精品亚洲人成在线| 在线看免费毛片| av成人观看| 国产偷亚洲偷欧美偷精品| 日本一区二区三区在线不卡| 91精品国产自产在线观看永久∴| 捆绑裸体绳奴bdsm亚洲| 欧美人xxxxx| www.亚洲男人天堂| 五月综合激情婷婷六月色窝| 日本欧洲一区二区| 日韩高清在线观看一区二区| 亚欧在线免费观看| 福利视频久久| 最近中文字幕日韩精品| 亚洲国产精品久久人人爱 | 免费毛片视频网站| 黄色网zhan| 国产精品扒开腿爽爽爽视频| 日韩一级视频免费观看在线| 国产色产综合色产在线视频| 欧美日韩一卡| 日本一区二区三区中文字幕| 成人免费毛片播放| 粉嫩av四季av绯色av第一区| 久久精品电影一区二区| 天天夜碰日日摸日日澡性色av| 成人网在线视频| 亚洲区在线播放| 亚洲成人综合在线| 国产一区91精品张津瑜| 日韩av久操| 国产在线免费看| 91国产精品视频在线观看| 国产精品一区二区三区观看 | 国产精品色哟哟| 国产精品日本| 五月天亚洲一区| 摸摸摸bbb毛毛毛片| 69堂免费视频| 狠狠色综合网站久久久久久久| 久久99久国产精品黄毛片入口| 欧美日韩精品一区二区三区四区| 国产欧美va欧美不卡在线 | 国产精品成人一区二区艾草| 亚洲欧美成人| 欧美a级网站| 久久久久久久毛片| 亚洲免费999| 欧洲xxxxx| 99re国产视频| 欧美激情网站在线观看| 欧美videossexotv100| 亚洲一区二区三区免费视频| 风流少妇一区二区| 久久久久久亚洲精品杨幂换脸| 亚洲成aⅴ人片久久青草影院| 免费成人深夜天涯网站| 亚洲污视频在线观看| 这里只有精品66| 国产精品乱子乱xxxx| 97在线免费观看| 亚洲一区二区福利| 56国语精品自产拍在线观看| 亚洲成人自拍一区| 国产欧美日本一区视频| 国产黄人亚洲片| 久久婷婷av| 色综合色综合| 国产精品调教视频| 99久久99久久精品免费看小说. | 久久综合五月| 午夜国产欧美理论在线播放| 日本欧美三级| 欧美黄视频在线观看| 欧美黑人欧美精品刺激| 中文字幕55页| 一本久道综合色婷婷五月| 久久免费看毛片| 日本一区二区三区四区高清视频| 91精品视频网站| 国产91精品网站| 午夜精品久久久久久久白皮肤| 丝袜亚洲欧美日韩综合| 日韩成人av网址| 日韩一二在线观看| 欧美日韩精品一二三区| 亚洲午夜国产一区99re久久| 国产精品午夜电影| 久久精品人人做| av电影一区二区| 国产精品18久久久| 男女男精品网站| 噜噜噜躁狠狠躁狠狠精品视频| 一二三区不卡| 国产高清一区| 水蜜桃精品av一区二区| 精品国产91| 曰本一区二区三区视频| 国产一区调教| 日韩成人午夜| 亚洲第一二三区| 妖精一区二区三区精品视频 | 日韩中文字幕一区二区| 精品一区二区国产| 国产亚洲一区二区三区在线播放| 97碰碰视频| 国产高清在线一区| 国产激情一区二区三区在线观看 | 一区二区免费在线观看视频| 无码人妻精品一区二区三| 欧美一级特黄aaa| 国产一级片中文字幕| 免费看三级黄色片| 日批免费观看视频| 永久免费未满蜜桃| 中出视频在线观看| 亚洲专区区免费| 极品久久久久久久| 成人涩涩小片视频日本| 伊人再见免费在线观看高清版| 日韩在线第一区| 欧美日本中文| 日韩精品免费视频一区二区三区| 欧美一区二区三区婷婷| 亚洲一区导航| 国产精品视频3p| 欧美极品在线观看| 99久久婷婷| 亚洲看片免费| 日本欧美一区二区三区| 国产美女视频一区| 97久久久精品综合88久久| 国产亚洲欧美一区在线观看| 亚洲欧美在线aaa| 午夜不卡在线视频| 欧美理论片在线| 亚洲国产高清自拍| 伊是香蕉大人久久| 97精品国产91久久久久久| 欧美在线精品免播放器视频| 国产日韩在线亚洲字幕中文| 国产激情美女久久久久久吹潮| 日韩国产欧美一区| 日韩精品久久一区二区| 国产成人精品无码播放| 精品无码av一区二区三区不卡| 国产男男chinese网站| 精品国产乱码久久久久久鸭王1| 98视频精品全部国产| 日韩国产一区二区| 视频一区二区不卡| 粉嫩嫩av羞羞动漫久久久| 日本一区二区三区视频视频| 亚洲成人一二三| 337p亚洲精品色噜噜| 中文字幕亚洲综合久久筱田步美| 97成人在线视频| 国产欧美一区二区在线播放| 天天爱天天做天天操| 亚洲黄色av网址| 69精品无码成人久久久久久| 日韩精品一区二区三区中文字幕 | 亚洲精品一线二线三线无人区| 国产一区二区三区高清在线观看| 久久全球大尺度高清视频| 91欧美日韩一区| 强开小嫩苞一区二区三区网站 | 国产一区二区三区的电影| 国产精品99久| 一区二区三区精品视频| 欧美精品九九99久久| 最近中文字幕日韩精品| 国产精品揄拍500视频| 日本日本精品二区免费| 亚洲人成无码www久久久| 一区二区黄色片| 亚洲肉体裸体xxxx137| 久久久久久自在自线| 欧美经典三级视频一区二区三区| 色久综合一二码| 一区二区国产精品视频| 国产精品久久久久久久久久久不卡| 日本一区二区精品| 特级西西444www| 激情不卡一区二区三区视频在线| 国产国产精品| 成人一区二区视频| 日韩人在线观看| 久久精品免费播放| 成人在线观看91| 欧美少妇性生活视频| 欧美a级片免费看| 亚洲人成免费网站| 久久亚洲一区二区三区四区| 欧美色综合网站| 欧美精品免费在线观看| 欧美国产综合视频| 九九久久久久久| 哺乳挤奶一区二区三区免费看 | 久久久久日韩精品久久久男男 | 一区二区影视| 久久亚洲一级片| 日韩欧美国产成人一区二区| 日本高清+成人网在线观看| 中文字幕av日韩精品| 这里只有精品在线观看视频| 国内黄色精品| 成人福利电影精品一区二区在线观看| 福利视频第一区| 九九热最新视频//这里只有精品| 欧美日韩大片一区二区三区| 国产又黄又嫩又滑又白| 最新亚洲精品| 91小视频在线| 亚洲第一网站男人都懂| 国产男人精品视频| av免费网站观看| 欧美9999| 国产成人精品亚洲日本在线桃色 | 九九热精品视频国产| 亚洲精品中文综合第一页| 国产福利在线观看视频| 91精品成人| 国产精品三级久久久久三级| 国产性色av一区二区| 麻豆成人小视频| 鲁大师私人影院在线观看| 午夜av一区| 综合久久久久久| 国产亚洲精品久久久久久牛牛| 欧美精品一区在线发布| 182在线视频| 99国产精品| 狠狠久久五月精品中文字幕| 97精品在线观看| 日日摸日日碰夜夜爽av| 粉嫩久久久久久久极品| 成人中文字幕合集| 日韩精品中文字幕在线观看| 欧美国产综合视频| 日本理论中文字幕| 亚洲综合精品| 欧美中文字幕一区| 国产精品丝袜高跟| 少妇性l交大片7724com| 亚洲女同中文字幕| 亚洲成人激情自拍| 日本精品久久久| 成人日韩在线视频| 成人一区而且| 一区二区三区免费| 欧美精品videosex极品1| 97超碰国产精品| 国产精品x8x8一区二区| 91丨porny丨在线| 在线播放国产一区中文字幕剧情欧美 | 91精品动漫在线观看| 亚洲成人综合在线| 国产精品电影一区| 亚洲午夜精品在线观看| 欧美日韩一视频区二区| 日本乱人伦aⅴ精品| 亚洲综合色激情五月| 素人fc2av清纯18岁| 蜜臀av一区二区三区| 欧美mv和日韩mv的网站| 欧美一区观看| 91精品亚洲一区在线观看| 99久久99久久久精品齐齐| 日韩亚洲欧美中文在线| 人妻有码中文字幕| 日韩极品一区| 欧美午夜宅男影院在线观看| 成人黄在线观看| 免费看的黄色网| 成人国产精品免费观看动漫| 色哟哟网站入口亚洲精品| 两根大肉大捧一进一出好爽视频| 日本高清免费电影一区| 韩曰欧美视频免费观看| 成人在线国产精品| 国产又黄又粗的视频| 国产成人精品亚洲午夜麻豆| 日韩视频免费在线观看| 亚洲精品一二三四五区| 黄色亚洲在线| 精品嫩草影院久久| 黄色网址在线免费看| 一本色道久久综合狠狠躁的番外| 亚洲资源中文字幕| 2014国产精品| 久久嫩草捆绑紧缚| 久久视频一区二区| 国产成人精品免费久久久久|