摘要:簡介:挪威斯塔萬格國際研究院(IRIS)發明了一種新鉆井方法,它有針對性的解決了連續管鉆井過程中清潔井眼和鉆壓控制等問題。可行性研究表明,使用這種已成熟應用的方法,也可以解決有接頭鉆桿鉆井中遇到的一些問題。 A JIP proves ...

簡介:挪威斯塔萬格國際研究院(IRIS)發明了一種新鉆井方法,它有針對性的解決了連續管鉆井過程中清潔井眼和鉆壓控制等問題。可行性研究表明,使用這種已成熟應用的方法,也可以解決有接頭鉆桿鉆井中遇到的一些問題。

A JIP proves the effectiveness of a new drilling method at IRIS’s Ullrigg facility. 

The new drilling method is based on a patented drilling fluid flow arrangement. It incorporates a pipe-in-pipe concentric drill, where one conduit is used to pump fluid into the well and the other carries the return fluid from the well. A sliding piston, attached to the drillstring downhole, separates dual-gradient annular drilling fluid and aids in pressure/traction control. Lastly, an optional liner can be inserted while drilling and expanded downhole during the same run. This option enables mono diameter well designs, simultaneously drilling and lining the well.

DRILLING RIG ADAPTATION 

The Ullrigg Drilling and Well Centre is a well-equipped, full-scale drilling rig with pumps, mud cleaning system, storage tanks, well-control equipment, 5-in. drill pipe etc. The vertical U1 well was used in the verification program. It has 13 3/8-in. surface casing to 354-m (1,161-ft) MD, and a 12 ¼-in. openhole section to 1,258-m (4,127-ft) MD. A 300-m-long 13¾-in. casing was installed and an 80-m-long cement plug was placed in the casing’s lower part for the drilling tests. 

The basic drilling setup uses a top-string adapter, the dual drillstring, a sliding piston, dual float and flow crossover. The setup is the same for both plain and line drilling, with field-proven rotating BOP and under-reamer technology used as enablers of the system, Fig. 1.


The idea for a new drilling method was born at Rogaland Research, now the International Research Institute of Stavanger (IRIS) in Stavanger, Norway. The idea was motivated by the challenges of solving hole cleaning and weight-on-bit control for coiled tubing drilling applications. After a feasibility study, the method was refined and found applicable to solve several challenges for jointed pipe drilling as well. The patented Reelwell Drilling Method showed unique features for the following applications: 

• Managed pressure drilling: Pipe connections can be performed at constant downhole pressure without any shut-in pressure at surface using a downhole valve.
• Liner drilling: A liner can be installed in the same run, while a new section is being drilled. Also, there is an option to expand the liner in the same run.
• Deepwater drilling: Return fluid is transported back to surface through the drillstring, enabling advanced gradients of the annular well fluid.
• Extended-reach drilling: The method generates hydraulic thrust downhole and offers unique hole cleaning capability. 

In 2004, Reelwell was founded and acquired intellectual property rights to the technology. A joint industry project to verify the method was then conducted from 2005-2008, funded by StatoilHydro, Shell and the Research Council of Norway. Beginning in 2005, the Research Council of Norway and Statoil funded a feasibility study, which was conducted by Reelwell. In 2006, Shell joined the project and the critical components were built and tested in the laboratory. Last year, a full-scale prototype was tested at IRIS using the research rig, Ullrigg. 

The main goal for the project was to verify the: 

• Proof of concept and its practical application on conventional drilling rigs
• Capability for hole cleaning and downhole pressure/traction control
• Drill-in liner application and optional liner expansion.
This article presents the basics of the method and the results from the verification program. 

Fig. 1 . The verification program tested plain drilling and liner drilling using two different tool sets.

Plain drilling’s equipment arrangement is shown on the left side of the figure. The sliding piston is attached to the dual drill pipe some distance above the lower BHA. The dual float and flow crossover are positioned at the top of the lower BHA. 

Liner drilling’s arrangement is shown on the right side of the figure including: a liner coupling attached to the dual float in the lower BHA, a liner expander, attached to the sliding piston and a liner attached between the liner coupling and the liner expander. 

The surface system includes a mud pump, which pumps drilling fluid into the side entry port of the top-string adapter and down the annular drillstring channel. The returning fluid comes back through the inner channel of the dual drillstring and passes through a surface choke system before returning to the shaker and mud tanks, Fig. 2. On the top of the BOP is a Rotating Control Device (RCD), which allows well annulus pressurization while drilling. The upper well annulus, between the sliding piston and the RCD, is pressurized by a pump.


Fig. 2 . This flow schematic of the surface system includes a mud pump, a surface choke system shaker, mud tanks and rotating control device on the top of the BOP.

The drilling sample consisted of a 300-m-long, 10¾-in. casing assembly hanging in the wellhead. The lower casing joint had a welded steel plug on the bottom end. The casing contains an 80-m cemented section on the bottom, covered by 15 m of sand, which was used for the drilling trials. The sand was removed from the well for inspection after drilling and lining was completed. 

A ¼-in. hydraulic control line is installed in the annulus between the 133/8-in. casing and the 10¾-in. casing to measure well pressure while drilling and for kick trials. The upper end of the line is connected to a pressure gauge at surface near the wellhead. The lower end of the line is connected to the inside of the 10¾-in. casing through a hole drilled in the casing at about 200 m depth, i.e. 100 m above the bottom steel plug. 

The 10¾-in. casing joints in the drilling sample were point welded in the connections to avoid unscrewing during drilling trials and the casing was locked for possible rotation at the casing hanger by a special arrangement. The 10¾-in. drilling sample was removed from the well after testing. 

At Ullrigg, the drilling fluid flow arrangement was modified, Fig. 3. The fluid is pumped into the side entry port of the top-string adapter through a separate 2-in. hose from the pump manifold. The return flow from the well comes from the top of the top-string adapter, through the main mud hose. From the standpipe the fluid flows through a 2-in. hose via the choke and down to the normal return-flow conduit.


Fig. 3 . At Ullrigg, the drilling fluid flow arrangement was modified so that the return flow from the well comes from the top of the top-string adapter, through the main mud hose.

TOOLS AND EQUIPMENT 

The following tools were used for plain drilling. The top-string adapter is positioned at the top of the dual drill pipe. This adapter contains a swivel and has one flow port to allow pumping drilling fluid down into the well and another port for the return flow from the well. The top-string adapter is attached to a hose for the side-entry inflow and is attached to the conventional swivel in the travelling block for the return flow. 

The dual drill pipe is a conventional 5-in. drillstring that was modified with inner pipe inserts in a patented arrangement. This allows for quick and easy modification of a conventional drillstring into a dual drillstring at the wellsite. 

The sliding piston is attached to the dual drill pipe downhole. It is arranged to always run inside the casing, and isolates the well annulus outside the dual drillstring. The piston allows for bypass flow when required, but also allows pressurization of the well annulus between the piston and the BOP/RCD. This arrangement converts the well into a hydraulic cylinder, where the sliding piston is the cylinder piston and the dual drillstring is the cylinder rod. The sliding piston allows the use of different fluid properties below and above the piston. Thus, it is possible to have a high-density kill mud in the well above the sliding piston, while the fluid in the well below the sliding piston is a lower density active circulation fluid. 

The dual float is a patented automatic pressure-operated valve positioned at the lower end of the dual drill pipe. This float enables simultaneous closure and opening of both drillstring channels. In the failsafe default position, the valve closes both channels. The float enables downhole isolation of the well and thus pressure-less connections at surface during Managed Pressure Drilling (MPD). 

The data acquisition and sensor package contains pressure sensors and flowmeters. The in-flow meter is mounted at the standpipe manifold and the return flowmeter is mounted at the exit of the return choke. The system has built-in computer models for diagnosis and control. 

The RCD was rented from Weatherford, a Williams model 9000. The tool is a simple, passive RCD with a 500 psi maximum pressure rating.
The upper annulus control consists of a pump set up for a maximum flow of about 400 liters per minute (lpm). The pump is remotely controlled from the driller’s cabin. 

The return choke was a remote dual choke, rented from Ullrigg. The choke panel was positioned next to the driller cabin to ensure easy communication between the driller and the choke operator. 

LINER DRILLING TOOLS 

Several additional pieces of equipment are needed for liner drilling. The liner expander is a patented system. The liner coupling is also patented and allows for the coupling of the liner to the drillstring with built-in switches for flow and rotation control.
The under-reamer, a DTU 7200, was rented from Smith. The under-reamer was mounted directly to a 7 7/8-in. tri-cone drill bit from Smith. This tool opened the hole from 7 7/8-in. to 9 1/2-in. 

The spider acts as a secondary drill floor and enables the setting of slips on the drill pipe when running the drillstring through the 8 5/8-in. liner, while the liner hangs in slips at the drill floor. It was rented from Odfjell. 

Ullrigg was set up for rotation with a hexagonal kelly. The kelly was modified with an inner string to match the inner string in the dual drill pipe. The top-string adapter was mounted on the top of the kelly. 

RESULTS 

After the 10¾-in. casing sample was installed and the BOP was mounted, the drilling sample was pressure tested to 270 bar against the closed BOP shear ram. The RCD was installed and tested prior to drilling. 

Figure 4 presents the results from the initial pressure tests of the upper annular volume in the well, i.e. the volume enclosed by the following surfaces: in the radial direction between the outside of the dual drill pipe and the inside of the 10¾-in. casing, and in the axial direction between the closed annular BOP and the sliding piston.


Fig. 4 . During the annulus test, the hook load increases in steps according to the increase in the annular pressure, demonstrating the hydraulic force transfer capability of the sliding piston.

During the test sequence, the pressure in the well annulus was increased stepwise to 50 bar using the upper annulus control pump. The test was performed with continuous circulation through the drill bit. The hook load increased in steps according to the increase in the annular pressure demonstrating the hydraulic force transfer capability of the sliding piston to the hook load. It also demonstrates the sealing capability, since there was no need to supply fluid to hold the pressure. 

When the drillstring is first lowered into the hole, and then pulled out of the hole, the return flow from the well responds immediately when moving the drillstring, Fig. 5. When not moving the drillstring, the return flow and the inflow have equal value. When moving the drillstring into/out of the well, the return flow increases/decreases respectively, due to the added closed-end steel volume that is lowered into the well.


Fig. 5 . When moving the drillstring inside the well, the return flow responds immediately when the drillstring is moved.

The figure shows that differential flow can be measured precisely and that the sensitivity to detect kick and drilling fluid loss is high. The resolution in measuring the volume changes by the differential flow arrangement is judged to be less than 10 lpm, i.e. very precise and fast compared to conventional detection methods. 

Drilling trials. Figure 6 presents the records from drilling one drill pipe joint through the cement plug using the plain drilling system. The pipe joint was drilled down in 40 min. with ROP up to 20 m/hr. The return flowrate is generally slightly higher than the inflow rate during drilling. Spikes occur in the return flow measurement at startup, and occasionally in the following minutes due to pipe movements etc. Occasional leaks were observed on the RCD during the trials, especially when the tool joints passed through the rubber sealing element.


Fig. 6 . When drilling the cement with the plain drilling system the return flowrate is slightly higher than the inflow rate.

Cuttings transport. The cuttings are particles with a maximum size of a few millimeters. However, in some instances particles of 1-3 cm were produced and efficiently transported to the surface during drilling operations. 

The demonstration program verified efficient transport of solids up to 10% concentration by volume. No plugging of the return flow conduit occurred during the tests. This demonstrates very high cleaning efficiency, and indicates the potential of the method to solve hole cleaning problems experienced in the field. The surface choke once showed a tendency to accumulate cuttings; however, it was successfully cleaned by flushing. 

Downhole pressure control. The pressure control system in the upper annulus above the sliding piston operated efficiently and reliably. When drilling, downhole pressure is determined by the drilling fluid density and the dynamic friction component in the return flow. When the pump is stopped, the dynamic component is zero. 

To keep constant downhole pressure in the well while the mud pump is stopped, pressure regulation is done by choking the return flow. After the dual float is closed, pressure in the well is isolated downhole by the sliding piston and the dual float. Thus, during connections there is no surface pressure. 

When restarting circulation after the connection, the dual float is again opened, and the circulation flowrate is established and adjusted, so that all required choking is performed through the return conduit and little or no choking is performed at the surface. The system’s capability to keep the downhole pressure near constant during connections was successfully proven during the test program. 

Controlling influx and loss. Proper well control was demonstrated by precisely measuring the gain/loss from the well, controlling gain/loss rapidly by choke or flowrate control and by closing the dual float to isolate the well at depth. The flow sensor arrangement enabled fast and precise detection of kick and loss, and both control methods were successfully demonstrated. The ability to avoid loss of the annular well fluid above the sliding piston was demonstrated in the pressure tests. The establishment of detailed well control procedures and the certification of tools are ongoing. 

Pipe handling. Figure 7 presents the situation while handling dual drill pipe, showing a connection at the drill floor. In general, the pipe handling was performed without any large difficulty or problem. Prior to operations, the return pipes were individually adapted and inserted into the conventional 5-in. drill pipe. The handling of the dual drill pipe then followed procedures similar to conventional pipe handling. The dual drill pipe was handled efficiently in singles, and was also racked in stands into the derrick.


Fig. 7 . Prior to the drilling, the return pipes were individually adapted and inserted into conventional 5-in. drill pipe.

Liner drilling. Drilling with liner was difficult because of a failure in the under-reamer tool. The only available tool, suited for our application, was used elsewhere prior to the test. The failure implied that the under-reamer arms did not open the hole to the required size. Drilling engineers decided to stop when the liner was drilled about 20 m into the new section. The liner was then expanded to hang in the 10¾-in. casing and released from the drilling BHA. After liner release, the drillstring was pulled to the surface, leaving the 85 m long liner section downhole as planned. 

Tool performance. The top-string adapter worked without any problems throughout the test period. The sliding piston showed excellent performance. The results indicate that 30 bar of backpressure gives about an extra 10 tons on the hook. The hook load increase represents a hydraulic force provided by the sliding piston, which can be converted into a downhole thrust force. The large potential and capacity for hydraulic WOB was thus proven. 

The dual float was subjected to an extensive test program in the laboratory. The tool experienced a leakage during the first part of the tests, due to a failure in the opening procedure. However, the tool was repaired and performed according to specifications during the rest of the trials. The tool has proven to be efficient for downhole pressure control. 

The liner expander performed well in several tests and the combination of the liner expander and the sliding piston proved to be a very efficient liner expansion system. The liner coupling also showed good performance during the trials. After pulling out of hole, the liner coupling was in good condition, and the primary mechanism for liner release was proven. 

CONCLUSION 

The new drilling method was successfully proven during the verification program, demonstrating that the sliding piston provides weight-on-bit by hydraulic means and prevents loss of the annular well fluid. Hole cleaning was efficient and could transport large cuttings in the returns. Gain/loss volumes of less than 1:100 were rapidly detected. Downhole well isolation was good and only small pressure fluctuations occurred during pipe connections. Drilling with liner was shown to be feasible, including liner hanger expansion and release from the liner after drilling. 

All components of the drilling system have proven acceptable performance. The verification program was challenged by a hole diameter less than planned, due to an improperly working under-reamer. This issue will be solved in future applications. 

The verification program has confirmed the practical application of this new drilling method. It also has large potential for MPD, for challenging pressure zones and depleted reservoirs. The method also has special features for extended-reach drilling and for deepwater applications. The next step is to demonstrate the method for deeper drilling in an onshore well.

關鍵字: drilling drill 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 m.179ck.com Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
国产精品亚洲一区二区麻豆_久久精品国产亚洲AV网站_亚洲成人网在线观看_久久精品国产亚洲夜色AV网站

<label id="un5f4"><meter id="un5f4"></meter></label>
  • <rt id="un5f4"><small id="un5f4"></small></rt>
    1. 亚洲高清123| 日韩精品一区二区三区四区五区| 久久精品国产色蜜蜜麻豆| 宅男噜噜99国产精品观看免费| 亚洲精品美腿丝袜| 少妇一级黄色片| 欧美激情一区二区三区久久久| 久久精品三级视频| 欧美成人手机在线| 奇米影视在线99精品| 欧美 日本 亚洲| 欧美一级欧美一级在线播放| 亚洲图片久久| 国产综合 伊人色| 樱花影视一区二区| 亚洲综合伊人| 亚洲aⅴ男人的天堂在线观看 | 亚洲a级黄色片| 亚洲精品一区二区三区婷婷月 | 高清国产午夜精品久久久久久| 午夜激情在线观看视频| 欧美不卡一区二区三区四区| 99精品小视频| 成人区一区二区| 91精品国产综合久久精品图片| 少妇精品久久久一区二区三区| 蜜桃网站成人| 色综合色狠狠综合色| 风间由美中文字幕在线看视频国产欧美| 亚洲最大的免费| 亚洲国产精品成人久久综合一区| 激情五月深爱五月| 91精品久久久久久久| 最新久久zyz资源站| 久久丁香四色| 精品视频一区二区三区四区| 亚洲成a人v欧美综合天堂| 成人性生交大片免费看96| 好吊色欧美一区二区三区视频| 亚洲成人福利片| 色愁久久久久久| 免费成人深夜夜行网站视频| 欧美美女视频在线观看| 欧美99在线视频观看| 女人和拘做爰正片视频| 日韩精品在线观| 蜜桃一区二区三区四区| 91精品又粗又猛又爽| 欧美孕妇性xx| 亚洲免费观看高清完整版在线 | 美女视频黄 久久| 亚洲一区和二区| 日韩免费在线免费观看| 中文字幕久久午夜不卡| 欧美a在线观看| 日本一区二区精品| 欧美肥妇毛茸茸| 国产精品久久777777毛茸茸| 三区视频在线观看| 欧美亚洲国产成人精品| 国产精品女同一区二区三区| 草草视频在线一区二区| 日本一区视频在线观看| 亚洲精品在线免费播放| 日日夜夜免费精品| 久久人人爽人人爽人人片| 成人在线中文字幕| 欧美性生交片4| 日韩一级网站| 成年人的黄色片| 91九色蝌蚪嫩草| 欧美中文字幕一区| 国产美女一区| 乐播av一区二区三区| 国产精品手机视频| 欧美一区二区性放荡片| 日本少妇一区二区| 你懂得视频在线观看| 久久日韩精品| 日韩成人av网| 成人av网站免费观看| 伊人久久大香线蕉综合影院首页| 亚洲欧洲日韩综合二区| 亚洲午夜未满十八勿入免费观看全集| 成人动漫一区二区在线| 婷婷综合国产| 国产午夜伦鲁鲁| 日本在线观看天堂男亚洲| 亚洲国产精品久久久久秋霞影院 | 亚洲欧美日韩国产中文在线| 欧美美女视频| 色噜噜狠狠一区二区三区狼国成人| 日韩免费av一区二区| 色综合天天做天天爱| 亚洲永久网站| 国产精品18在线| 日韩视频在线免费播放| 久久亚洲精品中文字幕冲田杏梨| 国产精品久久毛片| 亚洲五月综合| 成人精品在线观看视频| 日韩av电影在线观看| 中文字幕无线精品亚洲乱码一区 | 亚洲综合二区| 亚洲女人毛茸茸高潮| 在线精品亚洲一区二区| 欧美疯狂xxxx大交乱88av| 亚洲香肠在线观看| 夜夜爽av福利精品导航| 欧美一级片在线视频| 日韩一级片免费视频| 欧美一区二区三区…… | 视频在线观看国产精品| 秋霞欧美一区二区三区视频免费| 福利在线小视频| 久久久久久久久久久人体| 欧美日韩亚洲视频一区| 九色|91porny| 亚洲免费福利一区| 超碰caoprom| 亚洲人成人77777线观看| 欧美黑人巨大精品一区二区| 色综合天天做天天爱| 国产一区在线看| 九色精品国产蝌蚪| 成人午夜精品无码区| 亚洲精品久久久久久一区二区| 欧美美女操人视频| 欧美亚洲动漫精品| 99综合电影在线视频| 欧美高清视频手机在在线| 国产精品无码久久久久一区二区| 国产在线拍揄自揄拍无码| 26uuu久久噜噜噜噜| 欧美一区二区三区在| 国产视频一区二区在线| 亚洲少妇自拍| 超碰一区二区三区| 精品人妻一区二区免费| 中文字幕一区二区三区乱码| 日本亚洲精品在线观看| 亚洲精品456在线播放狼人| 亚洲精品老司机| 久草在线在线精品观看| 国内成人自拍| 色老板免费视频| 中文字幕 欧美日韩| 丝袜足脚交91精品| 国产欧美日韩专区发布| 亚洲最新中文字幕| 欧美日韩国产另类不卡| 久久久美女毛片| 日韩精品乱码免费| 色婷婷一区二区三区| 一级片一级片一级片| 三级网站免费看| 欧美狂野激情性xxxx在线观| 91在线视频精品| 久久综合伊人77777蜜臀| 欧美人与z0zoxxxx视频| 一区二区三区四区视频精品免费| 国产成人在线免费观看| 亚洲九九精品| 成人在线电影在线观看视频| 91香蕉视频在线播放| 性感美女一区二区三区| 成人免费在线网| 奇米视频888战线精品播放| 日韩av毛片网| 久热在线中文字幕色999舞| 欧美一级艳片视频免费观看| 亚洲自拍偷拍av| 97se亚洲国产综合自在线不卡| 亚洲一区二区三区高清不卡| 第九色区aⅴ天堂久久香| 日本精品在线播放| 在线看片中文字幕| 无码人妻丰满熟妇啪啪网站| 凹凸国产熟女精品视频| 一级日韩一区在线观看| 国产一区免费观看| 91久久在线视频| 欧美在线视频观看免费网站| 最近中文字幕2019免费| 精品国产成人系列| 欧美乱熟臀69xxxxxx| 午夜精品免费在线| 中文字幕一区二区三区在线观看 | 2017欧美狠狠色| 国模无码大尺度一区二区三区| 在线免费观看欧美| 我不卡手机影院| 国产精品亚洲二区| 欧美巨大xxxx| 久久久久久久久久久久电影| 亚洲综合第一区| 亚洲国产无码精品| 国产乱淫av麻豆国产免费| 日本久久久久久久久久久久| 免费拍拍拍网站| 精品人妻人人做人人爽| 天堂av免费看| 中文字幕制服丝袜在线| 日本一区二区三区免费观看| 国产精品二区二区三区| 亚洲综合成人婷婷小说| 国产在线拍偷自揄拍精品| 国产成人激情视频| 日本亚洲欧美成人| 国产999在线观看| 78色国产精品| 日韩av大片免费看| 欧美一区二区三区图| 国模gogo一区二区大胆私拍 | 亚洲欧美成aⅴ人在线观看 | 精品久久久久久无| 欧美精品v日韩精品v韩国精品v| 欧美午夜免费电影| 欧美日韩夫妻久久| 91精品国产综合久久久久| 6080日韩午夜伦伦午夜伦| 欧美剧情片在线观看| 91精品国产综合久久久蜜臀粉嫩| 精品视频在线免费观看| 欧美日韩国产免费| 欧美一区二区二区| 亚洲国产毛片完整版| 精品电影一区二区| 亚洲精品一二区| www.亚洲一区| 欧美激情视频在线| 日本久久精品视频| 国产免费亚洲高清| 成人欧美一区二区三区视频xxx| 国产精华一区二区三区| 欧美日韩精品免费观看视一区二区| 欧日韩一区二区三区| 一区二区三区我不卡| 久久久无码中文字幕久...| 男人用嘴添女人下身免费视频| 国产亚洲天堂网| 欧洲美女亚洲激情| 手机在线成人av| 日韩在线一卡二卡| 91精品国产自产在线丝袜啪| 欧美巨大xxxx| 欧美成人中文| 日韩和欧美一区二区| 丰满放荡岳乱妇91ww| 中文字幕欧美激情| 精品国产福利在线| 在线综合亚洲欧美在线视频| 日韩精品中文在线观看| 久久精品小视频| 国产精品jizz在线观看麻豆| 国产日韩在线一区| 日本一区二区三区四区高清视频| 国产精品无码乱伦| mm131国产精品| 李宗瑞91在线正在播放| 国产人与zoxxxx另类91| 教室别恋欧美无删减版| 国产精品毛片| 成人动漫一区二区| 亚洲乱码精品一二三四区日韩在线| 日韩欧美a级成人黄色| 精品欧美久久久| 久99久在线视频| 成人黄色av网| 一本一本久久a久久精品综合妖精| 欧美a v在线播放| 人妻在线日韩免费视频| 精品一区二区三区中文字幕| 四虎成人av| 久久国产夜色精品鲁鲁99| 国产色91在线| 欧美日韩三级一区| 日韩亚洲综合在线| 91免费高清视频| 中文精品一区二区三区 | 国产精品美女www| 日本不卡一区二区三区在线观看| 欧美一级淫片aaaaaaa视频| 亚洲v日韩v综合v精品v| 亚洲激情免费视频| 国产一级免费片| 超碰97久久| 在线欧美不卡| 国产区在线观看成人精品| 欧美在线视频日韩| 中文字幕日韩专区| av一本久道久久波多野结衣| 欧美国产视频一区| 亚洲久久久久久| 久久大胆人体视频| 秋霞午夜鲁丝一区二区老狼| 中文字幕一区在线观看| 日韩欧美亚洲一区二区| 欧美极品xxxx| 日韩av一区二区三区美女毛片| 国模杨依粉嫩蝴蝶150p| 很污很黄的网站| 亚洲国产精品综合久久久 | 93久久精品日日躁夜夜躁欧美| 激情久久av一区av二区av三区| 亚洲欧美日韩中文在线| 亚洲一区二区三区成人在线视频精品| 很污的网站在线观看| 国产7777777| 91精品国产自产在线观看永久∴ | 欧美多人爱爱视频网站| 久久天天狠狠| 99久久综合网| 麻豆国产欧美一区二区三区r| 日韩黄色片在线观看| 亚洲综合免费观看高清完整版在线 | 少妇高潮毛片色欲ava片| 精品成人无码一区二区三区| 欧美成人激情| 久久精子c满五个校花| 欧美二区三区91| 国产精品777| 男人天堂1024| 日韩av综合| 久久精品国产久精国产爱| 色视频一区二区| 69久久夜色精品国产69| 久久福利一区二区| 天天操夜夜操av| 美女91精品| 丰满岳妇乱一区二区三区| 国内精品美女av在线播放| 黄色网络在线观看| 麻豆天美蜜桃91| 美女尤物久久精品| 福利精品视频在线| 97视频在线观看亚洲| 国产又粗又长又爽视频| 人妻久久一区二区| 蜜桃久久久久久| 欧美视频在线观看一区| 国产精品久久久av| 午夜免费福利在线| 伊人春色之综合网| 久久麻豆一区二区| 日韩精品在线电影| 日韩一区国产在线观看| 免费看裸体网站| 欧美96一区二区免费视频| 欧美性色黄大片手机版| 国产精品揄拍500视频| 天天影视色综合| 99久久这里只有精品| 亚洲人吸女人奶水| 国内久久久精品| 日本999视频| 欧美精品一二| 亚洲精品成人精品456| 欧美黑人视频一区| caoporn超碰97| 日韩久久综合| 一片黄亚洲嫩模| 国产成人avxxxxx在线看| 一区二区三区入口| 亚洲国产精品久久久天堂 | 欧美日韩国产影片| 国产91aaa| www色com| 国产精品伊人色| 精品调教chinesegay| 亚洲国产综合自拍| 欧美二区观看| 久久久久久久久久久久久夜| 色狠狠久久aa北条麻妃 | 亚洲图片另类小说| 麻豆高清免费国产一区| 亚洲国产精品久久久久秋霞不卡| 日本视频一区二区在线观看| 黄色a级片在线观看| 成人免费高清视频在线观看| 亚洲天堂久久av| 国内精品视频一区二区三区| 加勒比中文字幕精品| 综合欧美亚洲日本| 欧美中文字幕第一页| 久久无码人妻一区二区三区| 黄色成人av网站| 91精品国产综合久久国产大片| 欧美区高清在线| 一区二区三区四区高清视频| 久久久高清一区二区三区| 午夜精品蜜臀一区二区三区免费| 成年人三级黄色片| 国产欧美一级| 精品精品国产高清a毛片牛牛 | 女人av一区| 精品久久久久久久久国产字幕| 97免费高清电视剧观看| 国产中文字幕久久| 国产欧美日韩另类一区|